001 Before
  • 001 Before
    Before Work Started - RJWs brief was to landscape this area of garden, which is a steep slope full of overgrown plants and weeds, into an area which included creating a new pond and decked area for seating.
  • 002 Before
    Before Work Started - RJWs brief was to landscape this area of garden, which is a steep slope full of overgrown plants and weeds, into an area which included creating a new pond and decked area for seating.
  • 003 ProgressDay 1
    Day 1 involved the removal of plants and trees not required for the project and the clearing of the raised are of garden.
  • 004 ProgressDay 2
    Day 2 - The top area was excavated and preparation of the site of the new pond was undertaken.
  • 005 ProgressDay 3
    Day 3 - Excavation of the site of the new pond was completed and land support structures were fitted in place.
  • 006 ProgressDay 4
    Day 4 - Land support structures were completed including marginal areas of pond periphery and completed final pond levels completed.
  • 007 ProgressDay 5
    Day 5 - The pond liner was fitted and both fish and aquatic life was transferred to the new pond whilst ensuring the present PH levels were maintained.
  • 008 ProgressDay 6
    Day 6 - The old pond area was backfilled. The first of the rustic supports were put in place on the top level.
  • 009 ProgressDay 8
    Day 8 - The steps and pathway to the top level were fitted along with the main supports for the top raised decking.
  • 010 ProgressDay 9
    Day 9 - This saw the completion of the top raised decking and the steps, pathway and marginal area of the pond was filled with green slate.
  • 011 ProgressDay 10
    Day 10 - The lower level garden was prepared for turf, paving and the lower level decking.
  • 012 ProgressDay 11
    Day 11 - The lower level decking framework was constructed.
  • 013 ProgressDay 13
    Day 13 - The final phase of the project was completed by the laying of turf and completion of decking.
  • 014 Complete
    Completed Project
  • 015 Complete
    Completed Project
  • 016 Complete
    Completed Project
  • 017 Complete
    Completed Project
  • 018 Complete
    Completed Project
  • 019 Complete
    Completed Project
  • 020 Complete
    Completed Project

  • 001 BEFORE
    Before Work Started
  • 002 BEFORE
    Before Work Started
  • 003 BEFORE
    Before Work Started
  • 004 DAY 1
    DAY 1 - Work commenced with the removal of the old fence and the errection of the new fence and screening panels.
  • 005 DAY 2
    DAY 2 - Work continued on the errection of the new fence and screening panels.
  • 006 DAY 3
    DAY 3 - Work continued on the errection of the new fence and screening panels.
  • 007 DAY 4
    DAY 4 - Work on the new fence and screening panels was completed.
  • 008 DAY 5
    DAY 5 - Work commenced on the decking structures with construction of the bases.
  • 009 DAY 6
    DAY 6 - Work continued on the decking structures with the laying of the deck floors and erection of the panels.
  • 010 DAY 7
    DAY 7 - Work continued on the decking structures with the laying of the deck floors and erection of the panels.
  • 011 DAY 8
    DAY 8 - Work was completed on the decking structures.
  • 012 DAY 9
    DAY 9 - The project was completed with the installation of the water feature and the laying of the surrounding chippings.
  • 013 AFTER
    The Completed Project.
  • 014 AFTER
    The Completed Project.
  • 015 AFTER
    The Completed Project.
  • 016 AFTER
    The Completed Project.
  • 017 AFTER
    The Completed Project.
  • 018 AFTER
    The Completed Project.
  • 019 AFTER
    The Completed Project.
  • 020 AFTER
    The Completed Project.
  • 021 AFTER
    The Completed Project.
  • 022 AFTER
    The Completed Project at Night.
  • 023 AFTER
    The Completed Project at Night.
  • 024 AFTER
    The Completed Project at Night.
  • 025 AFTER
    The Completed Project at Night.