Before
Work Started
- RJWs brief
was to landscape
this area of
garden, which
is a steep slope
full of overgrown
plants and weeds,
into an area
which included
creating a new
pond and decked
area for seating.
Before
Work Started
- RJWs brief
was to landscape
this area of
garden, which
is a steep slope
full of overgrown
plants and weeds,
into an area
which included
creating a new
pond and decked
area for seating.
Day
1 involved the
removal of plants
and trees not
required for
the project and
the clearing
of the raised
are of garden.
Day
2 - The top area
was excavated
and preparation
of the site of
the new pond
was undertaken.
Day
3 - Excavation
of the site of
the new pond
was completed
and land support
structures were
fitted in place.
Day
4 - Land support
structures were
completed including
marginal areas
of pond periphery
and completed
final pond levels
completed.
Day
5 - The pond
liner was fitted
and both fish
and aquatic life
was transferred
to the new pond
whilst ensuring
the present PH
levels were maintained.
Day
6 - The old pond
area was backfilled.
The first of
the rustic supports
were put in place
on the top level.
Day
8 - The steps
and pathway to
the top level
were fitted along
with the main
supports for
the top raised
decking.
Day
9 - This saw
the completion
of the top raised
decking and the
steps, pathway
and marginal
area of the pond
was filled with
green slate.
Day
10 - The lower
level garden
was prepared
for turf, paving
and the lower
level decking.
Day
11 - The lower
level decking
framework was
constructed.
Day
13 - The final
phase of the
project was completed
by the laying
of turf and completion
of decking.
Completed
Project
Completed
Project
Completed
Project
Completed
Project
Completed
Project
Completed
Project
Completed
Project